Project Construction Scheduler Job at Airswift, Katy, TX

bithYXlKaHc1Qytuc2h2d0s4MWdDNll5
  • Airswift
  • Katy, TX

Job Description

Airswift is looking for a Project Construction Scheduler to support a major client in Katy, TX on a 12-month contract

Location will be Katy until start of next year and after that will be assigned to a project in another state of the US with per diem provided

We're also looking at what's next for you and how we can help you build a career you're proud of.

Responsibilities:

  • Develops and maintains strong customer focused relationships with all stakeholders.
  • Understands project document controls and procedures.
  • Prepares quantity take-offs and incorporates the production analysis into the schedule.
  • Communicates with site staff and subcontractors to determine the actual construction progress and provide regular schedule updates based on provided information.
  • Completes site walks to verify short term lookaheads. Follows up with project team to validate the schedule.
  • Contributes in the planning and scheduling process through various construction phases (preconstruction, construction, system completions, etc.).
  • Supports the interactive planning and scheduling sessions.
  • Assists project management to create and monitor short term schedules and determine the impact on the master schedule.
  • Updates the schedule logic.
  • Provides progress reporting to project team to ensure subcontractors/crew performance in accordance with milestone dates
  • Creates 2D visual and 4D graphic schedules. 4D schedules are created for larger jobs.
  • Implements subcontractor schedules into the master project schedule and track progress.
  • Incorporates resource and or load costing data into schedules as required and align the schedule to other project management tools.
  • Continuously expands and updates professional knowledge of all scheduling software to ensure maximum efficiency and effectiveness.

Requirements:

  • Advanced knowledge of the Critical Path Scheduling method related to the construction industry.
  • Advanced working knowledge of scheduling software such as Primavera P6 EPPM
  • 4 - 6 years of industry experience
  • General knowledge of construction specifications, building materials, methods and procedures, and the ability to read and understand construction drawings, specifications, contracts, and proposal documents.
  • General Understanding of field construction operations and how a project is constructed, including logical sequencing of work through all phases of the project from pursuit to project closeout.
  • Ability to complete quantity take-offs and understand productivity rates
  • Ability to work independently or in a team environment with multiple stakeholders including estimators, field supervision, subcontractors, project team and clients.
  • Ability to work in a fast-paced environment while prioritizing work under strict timelines and being flexible to changing needs
  • Advanced skills using Microsoft Office Suite and other applicable systems

Job Tags

Contract work, Temporary work, For subcontractor, Work at office, Flexible hours,

Similar Jobs